Concrete bag calculator

Convert a concrete volume into a bag count using the mixed yield stated for your chosen pre-mixed product.

Result

Bags required

How to use this tool

  1. Work out your required volume first — use the concrete volume calculator if you don't already know it.
  2. Enter that volume and the yield per bag printed on the product; the default is only an illustrative starting point.
  3. Read the number of bags to buy.

Assumptions

Technical details: what the fields mean
Concrete volume needed volumeM3
Total concrete volume required, in cubic metres.
Yield per bag (check the pack) yieldM3PerBag
Volume of mixed concrete produced by one bag. The 0.0125m³ default is illustrative; replace it with the yield stated on your chosen product's packaging or manufacturer data.
Methodology

Bag count = required volume ÷ yield per bag, rounded up. The editable 0.0125m³ default is illustrative, not exact volume mathematics: actual yield depends on the mix. Use the yield stated on the selected product's packaging or manufacturer data.

Worked example

1m³ of concrete at the illustrative 0.0125m³ mixed yield per bag

Inputs: Concrete volume needed: 1 m³, Yield per bag (check the pack): 0.0125 m³

Result: 80 bags required

Practical guidance
Common mistakes

FAQs

How many bags of concrete are in a cubic metre?

At the illustrative 0.0125m³ yield per bag, the estimate is 80 bags. Check and enter the yield on your chosen mix's packaging or manufacturer data; it may differ.

Is it cheaper to use bags or ready-mix?

For small jobs (under about 1m³) bags are usually more practical. Above that, a ready-mix lorry is typically better value and less labour.

Last reviewed: 2026-10-11

Yield varies by manufacturer and mix design — treat this as a planning estimate and check your product's packaging.

This tool provides an indicative estimate, based on the assumptions stated above.

Theme and tool preferences, along with saved and recently used lists, are stored only in this browser.