Event-duration planner

Add up an event's total running time from its planned activities and the buffers between them — or work out how many activities fit into the time you have.

Result

Total event length

Total event length

How to use this tool

  1. Enter the number of planned activities (speeches, performances, agenda items).
  2. Enter the average length of each.
  3. Set a buffer between activities for transitions.
  4. Read the total event length.

Assumptions

Technical details: what the fields mean
Number of activities numberOfActivities
Number of distinct activities or agenda items planned.
Average minutes per activity minutesPerActivity
Average length of each activity.
Buffer between activities bufferMinutes
Transition time between activities — for seating changes, setup or applause.
Methodology

Total time = (activities × average length) + (buffer × number of gaps between activities).

Worked example

6 activities, 15 minutes each, 10-minute buffer

Inputs: Number of activities: 6, Average minutes per activity: 15 minutes, Buffer between activities: 10 minutes

Result: 2.33 hours (140 minutes)

A conference afternoon: 4 talks of 45 minutes with 10-minute changeovers

Inputs: Number of activities: 4, Average minutes per activity: 45 minutes, Buffer between activities: 10 minutes

Result: 3.5 hours (210 minutes) — a 13:30 start finishes at 17:00, before any break.

How many fit? 3 hours for 20-minute talks with 5-minute changeovers

Inputs: Time available: 180 minutes, Average minutes per activity: 20 minutes, Buffer between activities: 5 minutes

Result: 7 talks, using 170 minutes and leaving 10 spare. An 8th would need 195.

Practical guidance
Common mistakes

FAQs

How do I include time between activities?

Enter the buffer you want for each gap. The calculator adds one buffer between each pair of activities, with no buffer after the last activity.

How many sessions fit in my slot?

Switch to the 'how many fit?' direction and enter the time available, the session length and the changeover. It returns the most that fit and the minutes left over.

Last reviewed: 2026-10-11

Assumes uniform activity lengths and a fixed buffer — real events often have some activities that run over.

This tool provides an indicative estimate, based on the assumptions stated above.